成人无码mv在线播放,成人在线不卡观看,亚洲自拍婷婷五月天,亚州国产老人乱码在线视频

Welcome to [Yixing Wansheng Transformer Co., Ltd.]Official website!
CN EN

NEWS

The role of power transformers

Power transformers are one of the main equipment for power plants and substations. The role of the transformer is not only to increase the voltage to send electricity to the electricity area, but also to reduce the voltage to the voltage used at each level to meet the needs of electricity. In short, both boost and buck must be done by a transformer. In the process of transmitting electrical energy in the power system, voltage and power losses are inevitably generated. When the same power is delivered, the voltage loss is inversely proportional to the voltage, and the power loss is inversely proportional to the square of the voltage. Using a transformer to increase the voltage reduces the loss of power transmission.
Transformer is composed of two or more coil windings wound on the same core, the windings are connected by alternating magnetic field and work according to the principle of electromagnetic induction. The installation location of the transformer should be considered for easy operation, maintenance and transportation, and a safe and reliable place should be chosen. The rated capacity of the transformer must be reasonably selected when using the transformer. When the transformer is running at no load, a large amount of reactive power is required. These reactive powers are supplied by the power supply system. If the capacity of the transformer is too large, it not only increases the initial investment, but also makes the transformer run at no load or light load for a long time, which increases the proportion of no-load loss, reduces the power factor, and increases the network loss. This operation is neither economical nor reasonable. If the transformer capacity selection is too small, the transformer will be overloaded for a long time and the equipment will be damaged. Therefore, the rated capacity of the transformer should be selected according to the needs of the electrical load, and should not be too large or too small.
2019/06/03 13:48:46 7633 click

Related Documents

Copy right ? 2019 Yixing Wansheng Transformer Co., Ltd.

主站蜘蛛池模板: 邳州市| 慈溪市| 磐安县| 高碑店市| 临颍县| 柯坪县| 大田县| 西和县| 北安市| 剑阁县| 且末县| 海阳市| 内江市| 来宾市| 贡嘎县| 疏附县| 青海省| 承德县| 呼和浩特市| 且末县| 沙雅县| 涿鹿县| 颍上县| 九江市| 宿迁市| 徐州市| 巴彦县| 安达市| 崇礼县| 峨边| 长武县| 伽师县| 眉山市| 福清市| 灵石县| 林芝县| 紫金县| 佳木斯市| 桐城市| 科技| 孟连|